On week eight as a group we split the work load, Johnson completed the casting list, I did the risk assessment and production schedule, Timi wrote the lyric description on the shooting script.
We spilt the work load so that as a group our group work can be done quicker and one can help the other if there were any difficulties. As a group we completed the shooting script, the shooting script was  time consuming because we had to complete 88 camera angles types, shot and movements, put each sentence of the lyrics on each line which adds to 88, duration, music and sound effect, graphics, description of action, equipment and actors.
Also, checked the weather forecast so that we know what the weather would be like during the week we film and so that the rain does not damage the camera. We booked to set up a small stage so that we can capture Yungen performing on stage.